| Pathway | BECCS |
|---|---|
| Method | Unknown |
| Country | United Kingdom |
| Website | https://www.lynemouthpower.com/ |
| lynemouth-power-limited | |
| Status | π’ Active (score: 70/100) |
| Company size | Small (10 to 49) (EU SME size class, derived from the LinkedIn size band; exact headcounts are not published) |
| CDR Focus | side_business |
About
Lynemouth Power Limited operates a 420MW biomass power station in Northumberland, UK, converted from coal to wood pellets, owned by EP UK Investments (part of Czech energy group EPH). The company is developing a BECCS retrofit and has passed the UK Government’s Track-1 Phase 2 deliverability assessment, entering formal bilateral talks with DESNZ for potential post-2027 negative-emissions operation. Electricity generation remains the primary business; BECCS is an adjacent future revenue stream.

History
- 2026-10-15 β refresh: coresignal, liveliness
- 2026-10-15 β liveliness: π‘ Moderate β π’ Active
- 2026-09-15 β refresh: screenshot
- 2026-05-01 β refresh: screenshot
- 2026-05-01 β refresh: liveliness
- 2026-05-01 β refresh: liveliness
- 2026-05-01 β liveliness: π’ Active β π‘ Moderate
- 2026-04-19 β reclassified: pathway=BECCS focus=side_business liveliness=π’ Active (source)
- 2026-04-19 β refresh: liveliness
- 2026-04-19 β liveliness: π’ Active β π‘ Moderate
- 2026-04-19 β reclassified: pathway=BECCS focus=supplier liveliness=π’ Active (source)
- 2026-04-19 β discovered via: cdrfyi (source)
AI-maintained, may contain errors. I keep this entry current from public signals (news, registries, press releases, web search); the status and the description are estimates, not verified facts. Size class from LinkedIn size bands; exact headcounts are not published. Seed list: Grant Faber's CDR company list (January 2026, CC BY-NC-SA 4.0). Corrections: info@carbon-drawdown.de. The same data as CSV, JSON and API.